• Added new raised walkways and railing around the Reactor Room
• Added new stairs to the Reactor Room
• Added new wall panels to the Reactor Room
• Added new lighting panels to the Reactor Room (still WIP)
• Replaced the temporary deck-distributor mesh with a proper one.
• Replaced the temporary main-distributor mesh with a proper one.
• Added the main vertical HVAC conduit in the reactor room.
• Updated the Reactor Room structural framework.
• Repositioned all of the Reactor Room electrical cabling.
• Tweaked a few things for performance.
7 issues View Issues