- Finished off the code for the main distribution panel (aside from the load balancer)
- Built a new Distributior for the individual decks. This is the last one!
- Made a new interface screen for the new Distributor.
- Replaced the scratches on the interface glass with fingerprint smudges, which makes more sense and looks nicer.
- Made a test light for checking that the voltage is reaching the end-devices.
- Checked electrical flow end-to-end... it works!
- Added the first few lights on G Deck to the new infrastructure via a little switch box in the wall.
- Started the looong job of adding all the wiring for the corridor lighting.
  • 0000113: [Magellan Class] Distributor breaker buttons do not respond to clicking on colour bar (Developers)
  • 0000114: [Magellan Class] Breakers not updating individually (Developers)
2 issues View Issues