- Built 8 Battery Charge Controllers and installed them in the maintenance tunnels.
(They still need a proper UI, the current one is a WIP)
- Laid temporary cabling to connect the chargers to the 4 battery busses.
- Added temporary lighting to all of the maintenance tunnel sections.
- Tweaked the framework cull distances in the maintenance tunnels.
- Cleaned up various parts of the electrical system code.
- Added the ability to press Alt+E to enable visual debugging of the electrical circuitry.
- Fixed the "Teleport to Bug" feature so that you are facing the bug properly (it was backwards).
4 issues View Issues